Back to Tools

PM Interval Optimizer

Find the sweet spot between over-maintaining and risking failure.

Cost Inputs

Optimal Interval

164 hrs

Perform PM every

164 running hours

Projected Savings

347

vs. Reactive Maintenance

Total Cost Optimization Curve

Use Real Data?

Upload failure history to calculate your specific failure curve.